国产伦精品一区二区三区免.费-你懂的国产在线-亚洲精品欧美久久-精品欧美黑人一区二区三区-亚洲精品女人久久久久-蜜臀av一区二区国产精品-亚洲欧美成人久久国产-国产成人一区二区在线观看-国产草草影院CCYYCOM-中文字幕色AV一区二区三区-最新无码视频在线观看-国产一区二区在线观看美女麻豆-在线免费看黄-国产五月天婷婷-丰满人妻av一区二区三区-99国产精品久久久久久久

For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Engineering Information
South-to-North Gas transmission Cross Yellow River beach Project
DongMing Cross Yellow River beach Project includes South-to-North Gas transmission Yellow River beach HDD Crossing Project:
Pipeline Specification: Φ355.6×7.92mm, LSAW (Longitudinally Submerged Arc Welding)
Crossing Distance: 1857m
And Modification of Cross-Yellow River section of ZhongYuan-Kaifeng gas transmission pipeline:
Pipeline Specification: Ф711×17.84
Design pressure: 8MPa
Crossing Distance: 1829.61m

A series of difficulties was encountered at early stage of the project, such as long crossing distance, steering control, complicated geological conditions; it was solved under proper organization of PM wang yanmin, lai yongbin, zhang chunjing and cooperation of all team members (Jia yongfang, chen yongliang, jia yongzhen, wang weiliang, ji shigui etc). Pull-back of South-to-North Gas transmission Yellow River beach HDD Crossing and Modification of Cross-Yellow River section of ZhongYuan-Kaifeng gas transmission pipeline was completed on March 28 and April 30 respectively.


Previous: Jordan Pipeline Rehabilitation Project
Next: Praise from Client of Beijing Water Group

  
About us /  Customer service / Contact us Copyright ? 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP備05002509號(hào)
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |