国产伦精品一区二区三区免.费-你懂的国产在线-亚洲精品欧美久久-精品欧美黑人一区二区三区-亚洲精品女人久久久久-蜜臀av一区二区国产精品-亚洲欧美成人久久国产-国产成人一区二区在线观看-国产草草影院CCYYCOM-中文字幕色AV一区二区三区-最新无码视频在线观看-国产一区二区在线观看美女麻豆-在线免费看黄-国产五月天婷婷-丰满人妻av一区二区三区-99国产精品久久久久久久

For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Engineering Information

Tianjin City drainage pipeline CIPP rehabilitation project completed successfully

 

Recently, the drainage pipeline CIPP rehabilitation project of Tianjin development 

district tenth avenue  (Nanhai Road to Taifeng road) gains with inspection and 

acceptance successfully, which is contracted by trenchless department of company, 

complete the rehabilitation DN400~DN1200 diameter pipeline, 2108 meters, and 

solves the stagger, fracture, corrosion, leakage and other structural defects of existing 

drainage pipeline .

 

The project adopts the steam curing method CIPP rehabilitation process, use the 

existing inspection to repair, and achieve 100% trenchless to repair the old pipeline. 

Use thermosetting resins and nonalkali fiberglass material, repairing lining layer 

thickness refers to the association of American engineers design standard 

ASTM F1216 and ASTM F2019 and issued by the ministry of housing and urban-rural development of the People's Republic of China industry standardthe urban drainage pipeline trenchless rehabilitation update technical regulations.

 

Tianjin project management and technical personnel of Trenchless department, 

According to the design requirements and the tender documents, combine with 

the practical situation of Tianjin tenth street drainage pipeline, take effective and 

security measures, overcome the original pipeline buried depth that is larger and 

deposition seriously detrimental to pigging, branch pipe flow more difficult to block 

water diversion, small room inspection well is not easy to work well under such as 

adverse factors, realize the commitment to the owner as following:

 

 

(1) Safety civilization construction, no major safety accident. 

(2) Not make excavation operations, using inspection Wells to reach 100% trenchless 

repairing the old pipe. 

(3) According to different lining layer thickness (4 mm to 10 mm), molding once, 

regardless of gradation construction. 

(4) Lining construction takeoff the membrane process, lining tube wall surface is not

 for plastic materials. 

(5) Tianjin quality supervision and inspection station test the quality of lining layer 

technology indicators: bending elastic modulus of more than 12000 mpa, axial tensile 

strength greater than 82 mpa, ring tensile strength greater than 118 mpa, the lining 

surface not less than 40 bar hardness D.

 

Tianjin project work of Trenchless department, obtained the supervision party, the 

owner, and Management Companys consistent affirmation, they think the company 

has high construction management specification, construction technical level, and 

construction quality, the company focus on the quality and credit enterprise, and 

trustworthy!

 

 


Previous: Accreditation of UV-CIPP Lining Technology
Next: Xihua-Fugou high pressure gas pipeline succeeded

  
About us /  Customer service / Contact us Copyright ? 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP備05002509號
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |