国产伦精品一区二区三区免.费-你懂的国产在线-亚洲精品欧美久久-精品欧美黑人一区二区三区-亚洲精品女人久久久久-蜜臀av一区二区国产精品-亚洲欧美成人久久国产-国产成人一区二区在线观看-国产草草影院CCYYCOM-中文字幕色AV一区二区三区-最新无码视频在线观看-国产一区二区在线观看美女麻豆-在线免费看黄-国产五月天婷婷-丰满人妻av一区二区三区-99国产精品久久久久久久

For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Engineering Information
Enlightens from the installation project in tank field of Yada, Iran
 
     The pipeline installation project in tank field of Yada, Iran, includes the construction of PR-9 pipe rack, three crude oil pumping stations and four crude oil storage tanks. The total dia-inch is approximately 26367.75 dia-inch in which the CS is 19943.75 dia-inch and LTCS is 6224.5 dia-inch, SS and DUPLEX SS are 199.5 dia-inch. After the reception of this project, Iran Branch Company encountered the condition of huge amount of work, short construction period and shortage of Chinese workers. What’s more, under international sanctions for years, Iran imposes restrictions on human resource, the importation of materials and equipments. Facing these difficulties, the Iran branch company changed its mind and sought a plan of ‘construction-localization’.      
     In the earlier stage of the project, there were only four Chinese employees in the Iran worksite. They carried out their tasks vigorously and speedily. They trained the local employees and put the ‘list management’ into force. Through hard work, they cultivated many excellent Iranian employees that they can governed their own workers. At the same time, they made special trainings to the main positions, like the head of operation, technicians, plumbers, welders and safety officers and so on. They compiled preventive measures in safety and quality for the program which made the whole construction under control.   
      The whole management personnel cooperated closely and each of them performed their own functions and duties. Under the leading of these four Chinese employees, more than 80 local workers had finished the construction successfully. Their performance was highly approved and appreciated by the first party.

Iran Branch Company can take the method of ‘local management of the foreign projects’. They conducted international management and realized the flexibility use of management tools. In this project, the methods of ‘list management’, ‘management localization’ and ‘special training for the special positions’ had been proved to be effective. The achievement of this project had accumulated precious experience for th e future ‘foreign project localization’ and the ‘management localization’.

                                                                                    Management Team in Worksite

                                                                                    Safe and Civilized Construction

                                                                                        Installation Site of Steelwork

 


Previous: First-class service and first-class quality
Next: Wuhan Crossing Dragging Pipeline Successfully

  
About us /  Customer service / Contact us Copyright ? 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP備05002509號
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |